Fluke Corporation MET/CAL Procedure ============================================================================= INSTRUMENT: Fluke 30: CAL ADJ /5500 DATE: 02-Feb-95 AUTHOR: Fluke Corporation REVISION: $Revision: 1.1 $ ADJUSTMENT THRESHOLD: 70% NUMBER OF TESTS: 1 NUMBER OF LINES: 87 CONFIGURATION: Fluke 5500A ============================================================================= # # Source: # Fluke Model 30 Clamp Meter Service Information (PN 929042 January 1994). # # Compatibility: # 5500/CAL 4.0 or MET/CAL 4.0 or later # # Subprocedures: # None # # Required Files: # 55_30.bmp # # System Specifications: # TUR calculation is based on specification interval of the accuracy file. # The default 5500A accuracy file contains 90 day specs. # # Fluke makes no warranty, expressed or implied, as to the fitness # or suitability of this procedure in the customer's application. # # The 90 day specifications of the 5500A are used in TUR computations. # STEP FSC RANGE NOMINAL TOLERANCE MOD1 MOD2 3 4 CON 1.001 ASK- W 1.002 HEAD EQUIPMENT SETUP 1.003 DISP This procedure requires a 50-turn Toroid Coil. 1.003 DISP Refer to the 31/33 Instruction Manual figure 7, page 32 1.003 DISP for directions for constructioning a suitable coil. 1.004 HEAD CALIBRATION ADJUSTMENT 1.005 DISP Disassemble the meter by removing the four screws on the 1.005 DISP case back. 1.006 DISP Remove the battery cover and front panel. 1.007 DISP Turn on the meter and use a DMM to verify that the 1.007 DISP battery level is between 7 and 9 volts. If the battery 1.007 DISP does not meet this criteria, replace the battery before 1.007 DISP proceeding with the procedure. 1.008 DISP The Test equipment should be allowed to warmup and 1.008 DISP stablize for at least 30 minutes before starting the 1.008 DISP adjustments. 1.009 PIC 55_30 1.010 HEAD CALIBRATION ADJUSTMENT: AC Voltage 1.011 RNG 200V AC 1.012 5500 100.0V 60H SI S 2W 1.013 DISP Adjust VR3 for a UUT reading of 100.0V. 1.014 5500 * S 1.015 HEAD CALIBRATION ADJUSTMENT: AC Current 1.016 RNG 200A AC 1.017 5500 191.0A 60H SI S T5 1.018 DISP Adjust VR2 for a UUT reading of 191.0A. 1.019 5500 * S 1.020 RNG 400A AC 1.021 5500 350A 50H SI S T5 1.022 MEMI Enter UUT reading in amps: 1.023 MATH MEM1 = MEM - 350 1.024 JMPZ 1.027 8U 1.025 DISP Balance the calibration between the 200A and 400A ranges 1.025 DISP so that both ranges fall within tolerance. 1.026 JMP 1.015 1.027 DISP Remove the UUT from the toroid. 1.027 DISP Disconnect the toroid from the 5500A. 1.028 HEAD CALIBRATION ADJUSTMENT: Continuity Beeper 1.029 RNG 200Z 1.030 5500 30.1Z S 2W 1.031 DISP Adjust VR4 until the beeper sounds. 1.032 5500 * S 1.033 DISP Disconnect the 5500A from the UUT. 1.034 HEAD CALIBRATION ADJUSTMENT: Low Battery Indication 1.035 DISP Disconnect the battery from the UUT. 1.036 DISP Connect the 5500A Output to the UUT battery terminals. 1.037 5500 6.9V S 2W 1.038 DISP Adjust VR1 until the low battery indictor 1.039 5500 7.0V S 2W 1.040 OPBR Is the low battery indicator off? 1.041 JMPF 1.034 1.042 END